Our Projects

Projects Gallery
  • MARJAN INCREMENT PROGRAM PKG#12

    HYUNDAI CONSTRUCTION

    ASPHALT ROAD WORKS
    2023
    2025
    ONGOING

  • REINFORCEMENT OF RABIGH POWER PLANT 1.2 GW SCC6-5000F 3+1 PROJECT

    ELSEWEDY/SIEMENS ENERGY

    SITE PREPARATION ASPHALT ROAD, FENCE, SECURITY GATE, GATE HOUSE
    2024
    2024
    ONGOING

  • ELECTRICAL INFRASTRUCTURE WORKS

    SEDRA-2
    ELECTRICAL INFRASTRUCTURE WORKS

    2023
    2026
    ONGOING

  • VILLAH SEDER-ABUKOYOUH, FIRE FIGHTING

    SEDRA GROUP
    VILLAH SEDER-ABUKOYOUH, FIRE FIGHTING
    2023
    2024
    ONGOING

  • HDPE PIPES TO PHASE II GYPSUM STACK EXPANSION PROJECT

    NATIONAL BASICS COMPANY
    HDPE PIPE
    2023
    2024
    ONGOING

  • SOUTH BORDER INFRASTRUCTURE

    Ministry of defence
    EPC
    2021
    ONGOING
    LUMPSUM
    74 MILLIONS SR

  • Smart City Project Dahran Community

    saudi aramco / Wipro
    Supply and installation of valve box
    2022
    ONGOING
    UNIT RATE
    12 MILLIONS SR

  • Design, Build & Operation of the Neom Gulf Of Aqaba Base Camps (North & South)

    ITEAC/NEOM
    EPC
    2021
    ONGOING
    LUMPSUM
    38 MILLIONS SR

  • Engineering Design Services for the Design, Build and Operate Gulf of Aqaba Pioneer Camp and Office Project

    RAPCO/NEOM
    EPC
    2022
    ONGOING
    LUMPSUM
    28 MILLIONS SR
  • SOUTH GHAWAR GAS SEPARATION PLANT & ASSOCIATED FACILITIES

    JGC/ARAMCO
    EPC
    2021
    2022
    LUMPSUM
    35 MILLIONS SR
  • MFC 2 Culverts and Washouts INSTALLATION WORK

    ARAMCO
    Scope of work includes the Installation of pipe Culverts / Washouts
    2021
    2021
    UNIT RATE
    25.5 MILLIONS SR
  • KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND SERVICES / MARITIME YARD PROJECT (MYP) PACKAGE # 4, 5 & 6

    Sepco Arabia Co. & Synohydro RADIAT CONT.
    Engineering & site Supervision
    2021
    2021
    LUMPSUM
    8.25 MILLIONS SR
  • REPLACE ELECTRICAL EQUIPMENT AT ABQAIQ GOSP-3, SHEDGUM GOSP-4, ABQAIQ GOSP-6, AINDAR GOSP-2 and AINDAR GOSP-4.

    ARAMCO / AL-GIHAZ CONT.
    1. Scope of work includes the Installation/Erection of Steel Structure for cable racks as per AL-GIHAZ supplied BOQ and Drawings at ABQAIQ GOSP-3, SHEDGUM GOSP-4, ABQAIQ GOSP-6, AINDAR GOSP-2 and AINDAR GOSP-4.
    2021
    ONGOING
    UNIT RATE
    12.5 MILLIONS SR

  • INSTALLATION OF FIRE LINE AT WARE HOUSE DHARAN ARAMCO

    ALBILAD END CLIENT: SAUDI ARAMCO
    INSTALLATION OF FIRE LINE AND WATER LINE
    2021
    2021
    UNIT RATE
    953,480.00 SR
  • HVAC & FIRE FIGTHING SYSTEM

    AL-MOOSA PRAVIATE HOSPITAL
    INSTALLATION OF CHILLER UNITS. INSTALLAION OF AIR COOLING SYSTEMS INSTALLATION OF DUCTS. INSTALLATION OF FIRE FIGHTINGS
    2021
    ONGOING
    UNIT RATE
    7.2 MILLIONS SR

  • RI 20399 _RTR CIVIL AND FABRICATION JOB

    TIHAMA POWER GENERATION COMPANY LTD END CLIENT: SAUDI ARAMCO
    RTR CIVIL AND FABRICATION JOB
    2020
    2021
    UNIT RATE
    172,212.00 SR
  • HVAC & FIRE FIGTHING SYSTEM

    ABHA PRIVATE HOSPITAL
    INSTALLATION OF CHILLER UNITS. INSTALLAION OF AIR COOLING SYSTEMS INSTALLATION OF DUCTS. INSTALLATION OF FIRE FIGHTINGS
    2019
    2020
    UNIT RATE
    6.8 MILLIONS SR

  • CONSTRUCTION OF VILLAS AT NESAJ TOWN 2 DAMMAM RESIDENTIAL AREA

    NESAJ
    CIVIL,ARCHITECTURALSTRUCTURAL MECHANICAL ELECTRICAL WORK TELECOMMUNICATION WORK
    2018
    2020
    LUMPSUM
    18 MILLIONS SR

  • UDHAILIYAH GAS PLANT : 3 WELL HEAD WORK

    SAUDI ARKAD END CLIENT: SAUDI ARAMCO
    CONSTRUCTION OF WELL HEAD: 12 KM EXCAVATION, PIPING & 6 KM ROAD CONSTRUCTION.
    2017
    2018
    UNIT RATE
    3 MILLIONS SR

  • PIPE LINE UDHAILIYAH

    SAUDI ARKAD END CLIENT: SAUDI ARAMCO
    EXCAVATION PIPE INSTALLATION BACK FILLING FABRICATION AND INSTALLATION OF THE SUPPORT
    2016
    2017
    UNIT RATE
    10 MILLIONS SR